Dublin Airport Floors

Work carried out in conjunction with Glenbeigh Construction and Kelly Floor and Tiles.

Various specialised projects have been completed at Dublin Airport on behalf of the DAA. Works such as the breaking and removal of concrete floors to Terminal 1 arrivals hall land side and airside have been completed with our micro “Zero Emissions” machinery. Floors were broken with our dual powered 1 ton excavator inside the terminal buildings and removed to skips outside the terminal via our battery powered barrows and 1 ton dumper.

Specialised breaking of screeds over structural floors have also been completed, whilst leaving the structure in place after removing the screed.